Modernize the original group of elevators in a fully occupied Class A office building.  The project required early morning crane picks to lift the new machines and controls to the rooftop machine room.  The machine room was constructed of concrete presenting an obstacle to bringing equipment into the room.  The original plan called for the building to open the concrete wall to accommodate the size of the machinery.  Star was able to breakdown the equipment and utilize the existing doorway saving the customer time and money on the project.